Planning Portal

DfI Planning Applications Advertised

Application Reference Site address Proposal Type of Advertisement Date Advertised Link to Advert
LA06/2019/0568/RM Lands south east of the Copelands Link Roundabout at the Comber Bypass Residential development comprising 80 housing units, open space, access roads and other associated works. Initial Ad 18 July 2019 Copy of Advert (Opens PDF document in a new browser window 47 KB)
LA04/2019/0871/F
7 Airport Road, Belfast, BT3 9DY
Variation of Conditions 16 (Drainage layout) and 20 (Hard and Soft Landscape works) attached to planning permission LA04/2015/0301/F (for the construction and operation of combined heat and power generating station) Re-advertisement 4-5 July 2019 Copy of Advert (Opens PDF document in a new browser window 47 KB)
LA07/2018/1627/F
Lands to the south and east of the Carnbane Way/Shepherds Way Roundabout incorporating Customs Clearance Station and lands to the rear of 7-14 Damolly Meadows, Newry.
Application under Section 54 of the Planning Act (Northern Ireland) 2011 to vary conditions 24 and 25 of planning permission P/2009/0163/F (for a comprehensive mixed use development) to allow for the commencement of development of the approved gatehouse only, in advance of submitting details of, obtaining approval for and implementing the reinforced earth retention structure and retaining walls required before the commencement of any other development on site. (Revised proposal description) Re-advertisement 1-4 July 2019 Copy of Advert (Opens PDF document in a new browser window 47 KB)
LA10/2015/0292/F Land Approximately 12km To The West Of Draperstown , Co Derry/Londonderry, 2km To The North Of Broughderg, Adjacent To The B47. Erection of 33 Wind turbines (comprising 10 turbines with a maximum tip height of 136m and 23 turbines with a maximum tip height of 149m), associated transformers and switchgear at the base of each wind turbine, hardstanding areas for erection cranes at each turbine, internal access tracks and site access, operations building and wind farm substation compound and building, on site electrical cables, a parking area, two temporary construction compounds, five permanent meteorological masts and all ancillary works including borrow pits, peat storage, spoil deposition, forestry removal and minor works to the public highway between site and Magherafelt to facilitate turbine delivery.(Amended proposal)
Planning Application Accompanied by an Environmental Statement
Publicity of Public Inquiry
25-27 June 2019 Copy of Advert (Opens PDF document in a new browser window 50 KB)
J/2011/0082/F Crighshane and Crighdenis townlands Killeter Castlederg Co Tyrone
Wind farm of 5 no. wind turbines with an overall base to blade tip height of 120.5 metres. Ancillary developments will comprise turbine transformers; turbine hardstands; construction of new access tracks and junctions; an electrical control building; communications antennae; underground electrical cables and communications lines connecting wind turbines to the electrical control building; on site drainage works and all ancillary and associated works.
Planning Application likely to have Significant Environmental Effects on Another EEA State (Republic of Ireland)
14 June 2019 Copy of Advert (Opens PDF document in a new browser window 35 KB)
LA04/2019/0871/F
7 Airport Road, Belfast, BT3 9DY
Variation of Conditions 16 (Drainage layout) and 20 (Hard and Soft Landscape works) attached to planning permission LA04/2015/0301/F. Initial Ad 13-14 June 2019 Copy of Advert (Opens PDF document in a new browser window 47 KB)
LA03/2018/1011/RM
Lands extending from north of Doagh Road (opposite no. 141 Doagh Road) to the Templepatrick Road, Ballyclare, immediately west of the cemetery, Huntingdale and Denisons industrial estate.
Major urban extension to include residential neighbourhood, southern section of Ballyclare Relief Road, local centre, riverside park and other open spaces, children's play areas and associated works. Planning Application for Reserved Matters Accompanied by an Environmental Statement 12-13 June 2019 Copy of Advert (Opens PDF document in a new browser window 48 KB)
LA10/2019/0508/F
Lands circa 1.3km east of Clabby, approx. 625m south east of 115 Aghintain Road, approx. 270m north east of 99 Clabby Road and approx. 410m north of 87 Clabby Road, townlands of Mullaghsilogagh and Furnish, Clabby, Tempo
Proposed 3no. free range poultry houses with internal egg stores (to contain 62000 birds per house giving an overall site capacity of 186000 birds) with 6no. heat exchangers, 6no. feed bins, 3no. underground wash tanks, concrete hardstanding and turning areas, access and associated site works. Planning Application likely to have Significant Environmental Effects on Another EEA State (Republic of Ireland) 31 May 2019 Copy of Advert (Opens PDF document in a new browser window 175 KB)
LA06/2017/0778/RM Land immediately adjacent to and south east of Copelands Link Roundabout at the Comber Bypass Residential development comprising 168 housing units, open space, access roads, pumping station and other associated works (amended drawings received) Re-advertisement 09 May 2019 Copy of Advert (Opens PDF document in a new browser window 46 KB)
LA04/2017/0878/F
Planning application site includes the power generation station site located on lands approx. 65m SE of 101, 101a, 101B and 103 Airport Road West, Belfast Harbour Estate, Belfast and also the route of the underground gas pipeline (UGP) connection from Kinnegar Army Barracks to the Power Station Site along the following roads:  Airport Road West, Esplanade Road, Moscow/Heron Road.  An above ground installation is located in SW corner of Kinnegar Army Barracks adjacent to Kinnegar WwTW
Erection of 480MW Combined Cycle Gas Turbine (CCGT) Power Station comprised of turbine hall/heat recovery steam generator building with 50m exhaust stack, air cooled condenser, 2 storey administration building, 2 storey workshop building, gas insulated substation, gas compressor station, gas pressure reduction station, associated water and fuel tanks and other associated infrastructure and ancillary development including provision of site access and road works to facilitate extension to pedestrian footways and delineation of a right hand turn lane. Construction of new Above Ground Installation (AGI) at Kinnegar Army Barracks and new underground pipeline along Airport Road West, Esplanade Road with option of also following Heron/Moscow Road and which will connect the Power Station Site to the existing gas transmission infrastructure at Kinnegar Barracks. Decision Notice Advert 02 -03 May 2019 Copy of Advert (Opens PDF document in a new browser window 49 KB)
LA04/2017/1388/F Lands: To The East Of The Westlink (A12); South Of (Nos.127-9) And Including Grosvenor Road; At Intersection Of Grosvenor Road And Stanley Street; At The Intersection Of Durham Street And Grosvenor Road; At The Intersection Of Fisherwick Place And Howard Street; At Great Victoria Street (between Nos. 1-3 To 27-45); At Glengall Street (between Nos. 3-21); At The Junction Of Hope Street, Bruce Street And Great Victoria Street; At The Junction Of Durham Street, Linfield Road, Sandy Row And Hope Street; At Sandy Row From 2 Hurst Park To 85-87 Sandy Row, Gilpins Site; To North Of Former Whitehall Tobacco Works At Linfield Road, Weavers Court Business Park/ Linfield Industrial Estate, Blythefield Primary School And Charter Youth Club; At Weavers Court Business Park And Railway Track Lands Surrounding Arellian Nursery And Bounded By Utility Street/Bentham Drive/Egmot Gardens/ Felt Street (to North); Prince Andrew Park And Abingdon Drive (to South); Beit Street, Roosevelt Rise,Roosevelt Square New integrated public transport interchange comprising; station concourse, 26 bus stands, 8 railway platforms, bus maintenance and parking, track and signalling enhancements, bus access bridge, cycle and taxi provision, car parking, new public square, public realm improvements, highway improvements, infrastructure improvements, temporary structures for bus operations during construction and temporary site construction compounds. Decision Notice Advert 18-19 April 2019 Copy of Advert (Opens PDF document in a new browser window 50 KB)
T/2014/0114/F
Hightown Quarry, 40a Boghill Road, Ballyutoag, Co Antrim and lands adjacent to the existing Boghill Road from its junction with Hydepark Road to the west of the existing access road into Hightown Quarry.
Proposed development of a Residual Waste Treatment Facility incorporating a Mechanical and Biological Treatment (MBT) facility, an Energy from Waste (EfW) Thermal Treatment facility, an Incinerator Bottom Ash (IBA) Treatment facility, a Refuse Derived Fuel (RDF) Bale Storage building, an Administration/Visitor Centre and related infrastructure including widening of the Boghill Road from its junction with Hydepark Road to west of the existing access road into Hightown Quarry site and other ancillary works (voluntary further environmental information received, supporting documents and amended drawings). Planning Application for Planning Permission Accompanied by an Environmental Statement - Receipt of Further Environmental Information 10-12 April 2019 Copy of Advert (Opens PDF document in a new browser window 51 KB)
LA03/2019/0149/O
Lands extending from north of Doagh Road (opposite No.0141 Doagh Road) to the Templepatrick Road, Ballyclare, Immediately West of the cemetery, Huntingdale and Dennisons Industrial Estate.
Application to vary Condition 3 (Revised Transport Statement), and Condition 10 (delivery of the entire relief road prior to commencement) and removal of Condition 8 (400 unit limit) of Planning Permission U/2006/0377/O Initial Ad 20-21 March 2019 Copy of Advert (Opens PDF document in a new browser window 47 KB)
B/2015/0005/F Land off Moys Road Approx 170m south west of 171 Glenhead Road Limavady Proposed development of 4 no. pig breeding units (in addition to the single unit previously approved under B/2013/0043/F) to house an overall site total of 2247 sows, 12 no. feed bins and 2 no. above ground sealed slurry stores and bleed off water storage tank and proposed air scrubber on previously approved unit. Planning Application likely to have Significant Environmental Effects on Another EEA State (Republic of Ireland) 8 March 2019 Copy of Advert (Opens PDF document in a new browser window 23 KB)
LA10/2019/0077/TBA
Behy, Cashelard, Tullyhorkey and Doobally approx. 2.74km. north of Beleek.
Application for a ten year planning permission for a wind farm with a 30 year operational life (from date of commissioning) and all associated works consisting of (a) up to 7 no. wind turbines with a tip height of up to 150m all associated foundations and hardstanding areas, (b) 1 no. on-site electrical substation, (c) 1 no. temporary construction compound, (d) 1 no. anemometry mast with a height of up to 100m, (e) recreational amenety trial and associated signage, parking, and recreational facilities, (f) all associated underground electrical and communications cabling connecting the turbines to the proposed on-site substation, (g) upgrading of existing access tracks and provision of any new site access roads required including new site access onto the local road network in the townland of Tullyhorky and associated drainage, (h) excavation of 1 no. borrow pit and (i) all associated site development works (including tree felling) at Behy, Cashelard, Tullyhorkey, Dobally, Co Donegal. Planning Application Likely to have Significant Effects on Northern Ireland 6-7 March 2019 Copy of Advert (Opens PDF document in a new browser window 49 KB)
LA03/2018/0601/O
Lands extending from north of Doagh Road (opposite No.0141 Doagh Road) to the Templepatrick Road, Ballyclare, Immediately West of the cemetery, Huntingdale and Dennisons Industrial Estate.
Application to vary condition 3 (Phasing Plan), condition 10 (occupation of dwellings), condition 19 (Travel Card), condition 21 (cycle infrastructure), condition 31 (Environmental Management Plan), condition 42 (landscaping details), condition 44 (Landscape Masterplan), and non-compliance with condition 4 (Phasing Plan), condition 9 (access arrangements), condition 11 (road drainage), condition 16 (TAS approval), condition 17 (geotechnical approval) and condition 18 (road safety audit) of planning permission U/2006/0377/O for major urban extension to include: residential neighbourhood, southern section of Ballyclare Relief Road, local centre, riverside park and other open spaces, children's play areas and associated works. ADDITIONAL INFORMATION RECEIVED - ECOLOGY REPORT AND FLOOD RISK ASSESSMENT Re-advertisement 6-7 March 2019 Copy of Advert (Opens PDF document in a new browser window 47 KB)
J/2013/0287/F
Meenamullan Windfarm in the, townland of, Meenamullan, near Killeter, Co Tyrone
A proposal for a windfarm comprising of five turbines (each with an overall maximum height of 125m above ground level) and associated infrastructure including an upgraded site entrance, new onsite access tracks, an onsite substation and control building, underground cables, two temporary monitoring masts, a permanent meteorological mast, a temporary construction compound, a temporary enabling works compound, permanent crane hardstandings and road widening and improvement works on sections of the transport route (road improvement works). Further Environmental Information (FEI) received Planning Application likely to have Significant Environmental Effects on Another EEA State (Republic of Ireland) 15 February 2019 Copy of Advert (Opens PDF document in a new browser window 24 KB)
LA04/2017/0474/F
Lands at 88 - 104 Andersonstown Road and between 36 - 42 Mooreland Park and 202 - 206 Stockman's Lane
Re-development of Casement Park to provide a new Stadium (Capacity of 34578). Development comprises: demolition of the existing facilities; construction of new pitch, boundary wall and stands, incorporating bar/restaurant & ancillary kitchen areas, conference, training, community and cultural heritage and education facilities, ancillary offices, player accommodation and welfare facilities, press/media & broadcast facilities, replacement floodlighting, stadium/event management suite, ground support facilities including new arrangements for vehicles and pedestrians, electronic display installations, storage, surface and undercroft car parking, hard and soft landscaping, new landscaped pedestrian access from Mooreland Park to Stockman's Lane. Use of the stadium for up to three outdoor music concerts in any calendar year (Amended/additional drawings and additional information). Planning Application for Planning Permission Accompanied by an Environmental Statement - Receipt of Further Environmental Information 31 January – 1 February 2019 Copy of Advert (Opens PDF document in a new browser window 50 KB)
LA03/2018/1116/RM
Lands adjacent to the north west of Ballyclare including lands bounded by Cogry Road/Rahee Road north of Ross Avenue/Clare Heights and north east and west of Ballyclare Rugby Club
Northern Section of Ballyclare Relief Road and Associated Works Planning Application for Planning Permission Accompanied by an Environmental Statement - Receipt of Further Environmental Information 30-31 January 2019 Copy of Advert (Opens PDF document in a new browser window 49 KB)
L/2011/0359/F
Gublusk Bay, Killadeas, Co Fermanagh, BT93
Tourist destination resort comprising: 100 berth floating marina, split level 83 bed hotel (3 storeys and mezzanine floor) with function room, leisure facilities, spa, conference room, bar and restaurant, 68 self-catering courtyard apartments (2 and 2 1/2 storeys high), 10 self-catering lodges (1 1/2 storeys high), single storey RNLI station with slipway, single storey reception building with restaurant, site shop, marina facilities and WW2 heritage exhibition.  All with associated landscaping, services, right hand turning lane, parking, pumping station and waste-water treatment plant Decision Notice Advert 23-24 January 2019 Copy of Advert (Opens PDF document in a new browser window 47 KB)
A/2009/0759/F Woodside Road Landfill Site, 48 Woodside Road, Newbuildings, Londonderry Closure works and reprofiling of former landfill site using inert materials to comply with Landfill Regulations (NI) 2003. Planning Application for Planning Permission Accompanied by an Environmental Statement 22-23 January 2019 Copy of Advert (Opens PDF document in a new browser window 47 KB)
J/2007/0667/F Golandun Dolan, Killeter, Castlederg Wind farm consisting of 4 wind turbines each with a maximum overall base to blade tip height of 125 metres. Ancillary developments include turbine transformers located internally or externally; turbine hardstands, widening and strengthening of an existing site entrance; an electrical control building with communications antennae; construction of new and amended access tracks and junctions; underground electrical cables and communications lines connecting wind turbines to the control building; on site drainage works; temporary site compound; installation of an 80 high permanent met mast and all ancillary and associated works. Decision Notice Advert 15-17 January 2019 Copy of Advert (Opens PDF document in a new browser window 47 KB)
Get Adobe Reader software (link opens in a new browser window)