Planning Portal

Draft PPS18: Renewable Energy
Annex 1 Technology: Grid Connection

B41. Due to cost considerations, the majority of electricity generation projects need to be located close to existing grid infrastructure with the capacity to accept the proposed generation capacity. (It may be possible for a very large plant to bear the cost of infrastructure improvement).
Previous Next
Get Adobe Reader software (link opens in a new browser window)