The following Table sets out the provision of housing in Coleraine at July 2004.0
Table 1: Housing Provision, July 2004
| Housing Provision | Number of Houses |
|---|---|
| Allocation 1998-2016 | 2,855 |
| Completions 1998-July 2004 | 950 |
| Under Construction July 2004 | 124 |
| Commitments July 2004 | 180 |
| Windfall Allowance | 137 |
| Urban capacity zonings | 1,373 |
| Phase 1 urban fringe zonings | 477 |
| Phase 2 urban fringe zonings | 379 |
|
In the period from December 1998 to July 2004, a total of 950 dwellings were completed in the town. In July 2004 there were 19 committed sites with planning permission for 310 dwellings under construction or not started. Therefore to meet the allocation of 2,855 dwellings, the Plan needs to provide sufficient sites to accommodate the balance of 1,595 dwellings.
Towards providing for this requirement a thorough evaluation of urban capacity has resulted in the identification of a further 40 sites with a total area of 59.4 hectares and an estimated potential of 1,373 dwellings within Coleraine’s urban footprint, which are physically suitable for housing development. It is assumed, within the Plan period 60% of this potential will be completed, therefore the projected yield from the identified urban capacity sites is 824.
In the context of development experience in the past 5 years, the Plan projects a further 137 dwellings may be expected to be developed on windfall sites over the remainder of the Plan period, bringing the total estimated yield within the urban footprint to 961 dwellings.
The Plan retains five undeveloped zonings carried over from the previous Area Plan, with a total area of 42.7 hectares and an estimated total capacity of 856 dwellings. Three of these zonings have applications for detailed housing schemes, either on all of the zoning or a significant part of the zoning. The balance of the largest of these housing zonings at Wattstown, without a current planning application, will be held for development into the second half of the Plan period as Phase 2 lands, and will not be released for development, before the year 2010. Its release will also be dependent on regular monitoring of the Plan, demonstrating that the need for these lands remains and there is a satisfactory balance of development, meeting the RDS objective of at least 60% of housing being completed within the urban footprint.
| Housing Zonings (Existing Commitments) |
|---|
| The following housing zonings have planning permission and are identified on Map No. 3/01a - Coleraine: |
| Location | No. of dwellings to be completed | Site area (ha.) | Commenced July 2004 | Map reference |
|---|---|---|---|---|
| Drumtarsey Road | 10 | 0.23 | Yes | CEH 01 |
| Wheatsheaf Park | 6 | 0.66 | Yes | CEH 02 |
| 22 Circular Road | 9 | 0.08 | No | CEH 03 |
| 7 to 21 Mountsandel Rd. | 37 | 0.41 | Yes | CEH 04 |
| 41 Portstewart Road | 25 | 0.80 | Yes | CEH 05 |
| Loguestown south | 21 | 0.85 | Yes | CEH 06 |
| Knocklynn Road west | 40 | 2.15 | No | CEH 07 |
| Somerset Park west | 18 | 1.03 | No | CEH 08 |
| 100 Castlerock Road | 26 | 1.31 | Yes | CEH 09 |
| Cairnhill | 6 | 0.22 | Yes | CEH 10 |
| Knockbracken Drive | 6 | 0.24 | No | CEH 11 |
| 46 Lower Captain Street | 8 | 0.04 | No | CEH 12 |
| Brook Green | 36 | 0.96 | Yes | CEH 13 |
| 20 Circular Road | 5 | 0.06 | Yes | CEH 14 |
| Knocktarna Grange (2 sites) | 6 | 0.51 | Yes | CEH 15 |
| 106-108 Long Commons | 8 | 0.03 | Yes | CEH 16 |
| 108 Mountsandel Road | 12 | 0.50 | Yes | CEH 17 |
| Former Irish Society Sch. | 21 | 0.59 | Yes | CEH 18 |
| Braemar | 7 | 0.16 | No | CEH 19 |
| Knockantern Grove | 8 | 0.60 | Yes | CEH 20 |
| Phase 1 Housing Zonings (Urban capacity) |
|---|
| The following urban capacity sites are zoned for housing development, subject to compliance with the key site requirements and other requirements for the development of each site consistent with relevant planning policy including current Planning Policy Statements and the specific considerations related to the submission of planning applications: |