Northern Area Plan 2016 Ballymoney Borough: Ballymoney Housing (Page 2 of 3)
|
Housing Zoning BYH 11 40 Ballymena Road (1.07 ha.)
|
Key Site Requirements - Development shall be within the range of 25 to 35 dwellings per hectare.
- The access to this site shall be from Ballymena Road, and located towards the south eastern end of the frontage providing sufficient spacing from existing junctions on the same side and the opposite side of Ballymena Road.
- The layout shall be designed with dwellings facing on to Ballymena Road.
- A footway shall be provided along the frontage of the site on Ballymena Road and linked to the existing network.
- Any development proposal shall identify all trees worthy of retention and ensure that no activity, works or storage takes place within the limit of the crown spread of the trees, or a distance of half the height of the trees, whichever is the greater.
- The mound and associated tree cover shall be retained within any future development.
- A bat survey will be necessary.
|
|
Housing Zoning BYH 12 1-5 Carnany Court (0.15 ha.)
|
Key Site Requirements - Development shall be within the range of 25 to 35 dwellings per hectare.
- The access to this site shall be from Carnany Park.
- The height, scale and design of any proposal shall have regard for the privacy and amenity of residents in the adjacent housing area.
|
|
Housing Zoning BYH 13 Meeting House Street (1.27 ha.)
|
Key Site Requirements - Development shall be within the range of 40 to 60 dwellings per hectare.
- Dwellings shall not be greater than two and a half storeys in height and with a main elevation on to Meeting House Street.
- The access to the site shall be from Meeting House Street.
|
|
Housing Zoning BYH 14 Rear of 19-27 Main Street (0.46 ha.)
|
Key Site Requirements - Development shall be within the range of 40 to 60 dwellings per hectare.
- Any housing development may require design and siting measures to mitigate potential adverse environmental effects including noise, odour and general disturbance from adjacent commercial properties.
- The development of this site may require additional lands to provide an access to a public road.
- Any development proposal shall identify all trees worthy of retention and ensure that no activity, works or storage takes place within the limit of the crown spread of the trees, or a distance of half the height of the trees, whichever is the greater.
|
|
Housing Zoning BYH 15 Site adjacent to 48 Knock Road (3.14 ha.)
|
Key Site Requirements - Development shall be within the range of 15 to 25 dwellings per hectare.
- The access shall be from Knock Road where a right turn facility may be required.
- Development of this site will require substantial improvements to the means of storm water disposal, with consequent potential costs to the developer.
- The hedgerow along the southern boundary shall be retained.
|
|
Housing Zoning BYH 16 Site adjacent to Ballymoney Showgrounds (0.96 ha.)
|
Key Site Requirements - Development shall be within the range of 10 to 15 dwellings per hectare.
- Any development proposal shall identify all trees worthy of retention and ensure that no activity, works or storage takes place within the limit of the crown spread of the trees, or a distance of half the height of the trees, whichever is the greater.
- The development of this site will require additional land to provide an access to a public road.
|
|
Housing Zoning BYH 17 Land at Townhead Street Car Park (0.20 ha.)
|
Key Site Requirements - Development to be within the range of 40 to 60 dwellings per hectare.
- Access to the site shall be on to Townhead Street.
- Development on this site shall have regard for its location on the edge of Ballymoney Conservation Area.
- Any future development proposal on this site shall reinstate the former street frontage, and respect its wider context as part of Ballymoney Town Centre in terms of height, scale, proportion, design, and external materials.
- Development shall not exceed three storeys in height, and shall reflect the informal character of the town centre streetscape particularly with regard to the variation in building height.
|
|
Housing Zoning BYH 18 9 Victoria Street (0.09 ha.)
|
Key Site Requirements - Development shall be within the range of 80 to 120 dwellings per hectare.
- The access to this site shall be on to John Street.
- No vehicular access to or from this site shall be permitted onto Victoria Street.
- No. 9 Victoria Street, part of a late-Victorian red brick terrace within Ballymoney Conservation Area, shall be retained in the context of any future redevelopment proposal.
- Development on John Street shall not be greater than two and a half storeys in height.
- A bat survey will be necessary.
|
|
Housing Zoning BYH 19 Café Lane/John Street (0.03 ha.)
|
Key Site Requirements - Development to be within the range of 80 to 120 dwellings per hectare.
- The access to this site shall be onto John Street.
|
|
Housing Zoning BYH 20 18-34 Meeting House Street (0.22 ha.)
|
Key Site Requirements - Development shall be within the range of 40 to 60 dwellings per hectare.
- A bat survey will be necessary.
- The access to this site shall be from Meetinghouse Street.
|
|
Housing Zoning BYH 21 Land at Rodeing Foot/Cockpit Brae (0.08 ha.)
|
Key Site Requirements - Development shall be within the range of 40 to 60 dwellings per hectare.
- The access to this site shall be onto the Meetinghouse Street slip road.
- A bat survey will be necessary.
|
|
Housing Zoning BYH 22 Land to rear of West Gate (0.83 ha.)
|
Key Site Requirements - Development shall be within the range of 25 to 35 dwellings per hectare.
- The development of this site may require additional lands to provide an access on to West Gate.
- A footway shall be provided along the entire frontage of the site and linked to the existing network.
- Development may require noise attenuation measures because of its proximity to the Belfast to Londonderry railway line.
- An open space link shall be provided from West Gate to the riverside corridor.
|
|
Housing Zoning BYH 23 Land at Milltown Rd/Balnamore Rd (1.11 ha.)
|
Key Site Requirements - Development shall be within the range of 25 to 35 dwellings per hectare.
- The environment along the river corridor and its setting shall be protected.
- The access to this site shall be from Milltown Road.
- Development may require noise attenuation measures because of its proximity to the Belfast to Londonderry railway line.
|
|
Housing Zoning BYH 24 Nursery, Market Street/Parkview (0.45 ha.)
|
Key Site Requirements - Development shall be within the range of 25 to 35 dwellings per hectare.
- The development of this site may require additional lands to provide an access Park View.
- A 2.0m wide footway shall be provided along the entire frontage of the site and linked to the existing network.
- Any development proposal shall identify all trees worthy of retention and ensure that no activity, works or storage takes place within the limit of the crown spread of the trees, or a distance of half the height of the trees, whichever is the greater.
|
|
Housing Zoning BYH 25 Lands adj. to Free Presbyterian Church Market Street (2.07 ha.)
|
Key Site Requirements - Development shall be within the range of 25 to 35 dwellings per hectare.
- The access to this site shall be from Market Street where a right turn facility may be required.
|
|
|