Planning Portal

Larne Area Plan 2010
Public Utilities

PU1

The Department has identified a location for a new sewage treatment works to serve Larne Town and the surrounding area. (See Plan Policy S1)
The Water Executive will construct the proposed new works within the plan period. The proposed new treatment works will be situated to the west of the Redlands Industrial estate within the present lagoon. In addition the existing pumping station at Drains Bay will be upgraded and new pumping stations provided in Larne Town at Murrayfield and Sandy Bay. The existing sewage treatment works at Blackcave and Glynn will be replaced with pumping stations.These proposals represent a major investment in the Borough.
Previous Next
Get Adobe Reader software (link opens in a new browser window)