Planning Portal

Fermanagh Area Plan 2007
Proposals: Enniskillen Housing Zonings H25-H28

H25 Tempo Road 1 - a O.9ha site, the development of which is now substantially complete.
H26 Flaxfield - a 6.2ha site to the north west of Flaxfield Wood and adjoining existing medium density housing to the south west. Two areas, one around Killynure Lough and another adjoining Flaxfield Wood are safeguarded from development by the designation of Local Landscape Policy Areas. The site slopes up from west to east. Development should respect existing slopes and contours and will be confined to single storey properties on rising ground. Landscaping should be provided as appropriate. Access will be permitted onto Killynure Park. A Water Executive pumping station is located within this site and electricity pylons traverse it. Development of this site has commenced.
H27 Tempo Road 2 - a 1 3.5ha site to the south east of the Tempo Road which comprises a level area adjoining the road and land generally rising south eastwards to Killynure Wood, which is safeguarded from development by the designation of a Local Landscape Policy Area as are two additional areas, one around Killynure Lough and another to the Tempo Road frontage which comprises regenerating trees. Additional landscaping should be provided as appropriate, particularly to break up the mass of future housing and to reinforce the regenerating trees on the Tempo Road frontage. A range of densities would be acceptable but development should respect existing slopes and contours and will be confined to single storey properties on rising ground. A single access to an appropriate standard will be permitted onto the Tempo Road and must incorporate the provision of a ghost island junction. A footway along the Tempo Road frontage will also be required as an integral part of the development. The south eastern portion of the site may require pumping to provide adequate sewerage facilities, whilst some infilling may be required on low Iying ground adjoining Kinarla Lough to provide a satisfactory outfall for future storm sewerage. In this latter area sub-soil conditions may also require that foundations are piled. Electricity pylons traverse this site. Development of this site has commenced.
H28 Tempo Road 3 - a 5.8ha site to the south east of the Tempo Road and opposite its junction with the Old Tempo Road. The site is reasonably level and contains some strong hedgerows which should be retained in any development. The mature trees to the eastern boundary and the regenerating trees to part of the Tempo Road frontage are safeguarded from development by the designation of Local Landscape Policy Areas. Additional landscaping should be provided as appropriate, particularly to reinforce existing hedgerows and the regenerating trees along the Tempo Road. Access to an appropriate standard will be permitted onto the Tempo Road and must have regard to the proposed Cherrymount Link Road junction. A footway along the Tempo Road frontage will also be required as an integral part of the development. Electricity pylons traverse this site.
Previous Next