Site Search | Site Map | A - Z Index | Useful Links | Feedback | FAQs | Help  
Planning Service Northern Ireland
Home  About Us  Corporate Services  Development Control and Enforcement  Development Plans and Policy

Home > Development Plans and Planning Policy > Development Plans > Cookstown Area Plan 2010  

In Development Plans and Policy
Development Plans and Planning Policy
Planning Strategies
Planning Policy Statements
Development Plans
Supplementary Planning Guidance
Minerals Planning
 Airport Public Safety Zones

 

 

 



Towns
 

Cookstown

Phase 2 Housing

 H 21      Land north of Lissan Road
                             

This 4.71 hectare site is partly green field and partly used for quarry related activities. The site rises to the north and is well treed along the western site boundary, which marks the break between town and country.

Key site requirements:

• adequate foul sewerage and a pumping station will be required;

• a right turning lane may be required at the access from Lissan Road;

• access through the site should be provided for public transport;

• the existing boundary trees and hedgerows should be retained;

• the treelined laneway on the eastern site boundary should be retained and pedestrian/cycle access provided;

• pedestrian/cycle access should also be made available to the housing site to the east of the site, H 01;

• at least 0.5 hectares of public open space incorporating children’s play provision should be provided, preferably located next to the eastern site boundary to link with the public open space required on the neighbouring housing site, H 01. The open space should also link with the pedestrian/cycle access along the eastern boundary; and

• the land on the site is steeply sloping and will require careful attention to matters relating to layout, siting, design and density.

 
 H 22      Land adjacent to 63 Lissan Road
                             
This 0.99 hectare green field site links road frontage housing to the north east with the rest of town. The land to the rear of the site slopes up steeply.

Key site requirements:

• housing on this site should face the road and continue the linear pattern to link with the existing houses further west on Lissan Road;

• accesses onto Lissan Road should be limited in number and be shared;

• mature vegetation on the eastern boundary should be retained; and

• the layout should be designed to ensure that houses front onto Lissan Road.

 
 H 23      Land east of Coolreaghs Road, rear of
               Mount View
                             
This 4.24 hectare greenfield site is located at the northern extremity of the town behind existing housing on Coolreaghs Road and slopes northwards to open farmland.

Key site requirements:

• access to the site should be from Coolreaghs Road. The road will require upgrading to a satisfactory standard;

• pedestrian/cycle access should be provided to link with the neighbouring housing site, H 02;

• access through the site should be provided for public transport;

• additional planting, together with screen planting of indigenous tree species, will be required on the northern and western boundaries;


• an open space of at least 0.4 hectares incorporating children’s play provision should be provided. The open space should be provided as a single site and could be located towards the southern boundary of the site; and

• the housing layout should open up views of the Sperrins from the street scene.

 
 H 24      Land south of Fountain Road adjacent to the
               proposed Eastern Distributor Road
                             
This 9.63 hectare site is located at the eastern extremity of the town and links Fountain Road in the north with the golf course to the south.

Development of the site is dependent on provision of the Eastern Distributor Road, the final phase of which follows the western site boundary. In the construction of the Eastern Distributor Road, a subway should be provided. Favourable consideration will also be given to the provision of local convenience shopping provided the net floorspace does not exceed 250 square metres. The shopping should be an integral part of the housing layout. A walkway is proposed by the District Council along the old railway track towards the eastern boundary of the site.

Key site requirements:

• access should be taken from Fountain Road;

• a footway/cycleway through the site should be provided to link the eastern boundary with the proposed subway under the Eastern Distributor Road;

• access through the site should be provided for public transport;

• a full tree condition survey should be carried out and where appropriate, mature trees and hedgerows should be retained;

• buffer planting should be provided where the site abuts the proposed Eastern Distributor Road;

• the open watercourse to the south of the site should be retained and pedestrian/cycle access provided along its bank;

• a footway/cyclepath should be provided along the route of the old railway on the eastern boundary of the site;

• a range of housing densities and house types should be provided;

• provision of a minimum of 0.5 hectares of open space including a kickabout area. The open space should incorporate the footpath/cyclepath and informal planting along the watercourse on the western boundary; and

• a reasonable level of landscaping and buffer planting should be provided where the site abuts the Unipork Factory.

 
 H 25      Land between Sandholes Road and the
               Ballinderry River
                             
This 17.37 hectare, mainly green field site, rises from the Sandholes Road and the Dungannon Road to a plateau before falling away to the Ballinderry River. The site contains existing houses and farm buildings.

Key site requirements:

• a full tree condition survey should be carried out and where appropriate, mature trees and hedgerows should be retained;

• a minimum of 1.75 hectares of public open space is required. Part of this could be outside the housing land within the Local Landscape Policy Area along the north eastern boundary of the site next to the Ballinderry River, which would be ideal for an informal park. However, smaller areas for children’s play provision should also be located elsewhere on the site;

• vehicular access to the site should be from the Sandholes Road and right turning lanes may be required;

• access to the site will not be permitted from Dungannon Road;

• access through the site should be provided for public transport;

• pedestrian/cycle access should be made available from Sandholes Road to the Ballinderry River corridor;

• a footbridge/cycle bridge should be provided across the Ballinderry River to the adjacent shopping facilities;

• a range of house types should be provided; and

• some of the land on the site is steeply sloping and will require careful attention to matters relating to layout, siting, design and density.

Provided all the key site requirements for this site are met, favourable consideration will also be given to the provision of local convenience shopping provided provision does not exceed a net floorspace of 250 square metres. The shopping should be an integral part of the housing layout.

 
 H 26      Land south of Orritor Road
                             
This 9.39 hectare, mainly green field, site contains existing dwellings and an open watercourse running from its northwestern corner to its southwestern corner.

Key site requirements:

• the mature vegetation on the northern boundary of the site should be retained, subject to compliance with sight lines;

• additional screen planting of indigenous local species of trees and hedging should be provided along the western and southwestern site boundaries;

• a detailed tree survey should be carried out and where appropriate existing mature trees and hedgerows should be retained;

• the open watercourse should be retained as an amenity for the housing and as a walkway/cycleway up to the southern boundary of the site;

• access including public transport/pedestrian/cycle movement should be made available to link Orritor Road through H 26 and H 17 to Tullagh Road;

• a footway should be provided along Orritor Road to link the access to the existing public footway network;

• at least 1 hectare of public open space, including equipped children’s play facilities and playing fields, should be provided. The open space should be located at the southern end of the site to link with the required open space on H 17;

• housing should be orientated to avoid overlooking neighbouring back gardens along the eastern site boundary;

• a range of house types should be provided; and

• the layout should be designed to ensure that houses front onto Orritor Road.

 
 H 27      Land north of Orritor Road, opposite
               Sperrin View
                             
This 5.26 hectare triangular site is located at the western edge of the town and has a treelined watercourse running through it. There is a small children’s play space nearby, although this is only large enough to cater for the needs of the neighbouring housing in Sperrin View.

Key site requirements:

• access through the site should be provided for public transport;

• the existing footway to the site frontage with Orritor Road will need to be widened;

• the mature vegetation to the north and western site boundaries should be retained and augmented;• a detailed tree condition survey, incorporating into the design those trees which are in good condition and can be retained, will be required;

• a minimum of 0.5 hectares of open space incorporating a kickabout area will be required. This should take the form of a linear park along the watercourse, which should be kept open as an amenity feature for the housing, with a walkway/cycleway running adjacent to it. Access should also be kept available along the stream to the northwestern boundary of the site;

• sewerage and pumping facilities, to the satisfaction of Water Service, will be required; and

• the layout should be designed to ensure that houses front onto Orritor Road.

 
 H 28      Land northeast of the junction of Maloon Road
               and Orritor Road
                             
This 5.67 hectare green field site rises from Maloon Road before falling away to a watercourse to the north.

Key site requirements:

• access including public transport/pedestrian/cycle movement should be made available to link Orritor Road through H 28, H 29 and H 19 to Lissan Road and Morgans Hill Road;

• access to the site from Maloon Road will require upgrading of Maloon Road and its junction with Orritor Road;

• a right turning lane may be required at the access from Orritor Road;

• approximately 0.5 hectares of public open space should be provided. This could be located next to the eastern site boundary to link with the public open space required for the neighbouring housing land, H 18 and H 19;

• the existing mature vegetation on the northern site boundary should be retained and augmented and the hedgerow along the eastern boundary incorporated into the housing layout;

• the stream on the northern site boundary should be left open and incorporated as a design feature in the form of a walkway/cycleway;

• the layout should be designed to ensure that houses front onto Orritor Road or Maloon Road;

• the barn building on site should be demolished to make efficient residential use of the site; and

• the pumping station should be upgraded to the satisfaction of Water Service.

Favourable consideration will also be given to the provision of local convenience shopping provided provision does not exceed a net floorspace of 250 square metres. The shopping should be an integral part of the housing layout.

 
 H 29      Land south of Lissan Road
                             
This 20.33 hectare green field site, containing a farm group, rises steeply to a hill top upon which are the remains of a rath. There is also an open watercourse running through the lower section of the site and an attractive tree lined farm lane to the south.

Key site requirements:

• access, including public transport/pedestrian/cycle movement, should be made available to link Lissan Road through H 29, H 28, and H 19 to Morgans Hill Road and Orritor Road;

• a footway should be provided along Lissan Road to link the access to the existing public footway network to the east and west of the site;

• a right turning lane may be required at the access from Lissan Road;• the watercourse running through the site should be kept open as a landscape feature and used as the route for a walkway/cycleway;

• the rath on the site should be protected and a tree circle reinstated around it;

• a minimum of 2 hectares of public open space should be provided. The open space should be divided between provision of informal open space at the rath, an extension of the Princess Avenue playing field, and retention of the open watercourse and existing lane way as a walkway/cycleway;

• a tree survey will be required and, where appropriate, existing mature trees and hedgerows should be retained and augmented, giving special attention to the western boundary and Lissan Road;

• the layout should be designed to ensure that houses front onto Lissan Road;

• a range of house types should be provided; and

• the land on the site is steeply sloping and will require careful attention to matters relating to layout, siting, design and density.

Favourable consideration will also be given to the provision of local convenience shopping provided provision does not exceed a net floorspace of 250 square metres. The shopping should be an integral part of the housing layout.